Digital Menu Board Installation (Week 3)

Shoreworx is currently managing a significant project in Detroit, MI, installing new indoor digital menu boards across 26 stores for a valued customer. So far, 12 out of the 26 stores have been successfully completed.
The scope of work includes installing menu board brackets, building superstructures above ceilings to support the boards, running Category 6 cables from network switches to Media Players, installing 110V X 20A electrical outlets above the screens for power, and mounting three screens on the main display along with one screen at the pre-order station.
Our dedicated technicians have been working tirelessly overnight to ensure each installation is completed on schedule and ahead of the Christmas deadline. A special thank you to Patrick and George for their exceptional leadership and perseverance, especially in overcoming unexpected challenges. Their hard work and dedication are deeply appreciated!